Home
About Us
Our People
Testimonials
TQM
Products
Showcase
FAQ
Job Oportunities
Contact Us
Cutomer Feedback
Sitemap
Intranet

You'll find included here, the most commonly asked questions in our industry. Should you not find the specific answer you're looking for, please give us a call!

Keywords::
Installation

How much notice does Floor Plans need to properly prepare for a job?

We suggest that our customer give 3 days notice for local jobs.  When there are long lead time products needed, we ask that our customers afford us the time required to meet their needs as well as the manufacturing firms needs.  
Vinyl

Do I have to remove my existing flooring before laying sheet vinyl?

The answer to that question would depend on several factors such as; what is the exiting flooring, what is it's condition, and is this a sub-floor or poured foundation application? Vinyl may only be placed over existing flooring in these specific conditions, and as always, we suggest you call us to be sure:

1.) Existing flooring must be completely adhered to the sub floor/foundation - no bubbles or peeling

2.) Existing vinyl must be prepared with solvents and or other products specifically designed for the application

3.) Manufacturer's directions for new flooring product must specify that warrantee is still valid if installed over existing flooring

| Home | About Us | Our People | Testimonials | TQM | Products | Showcase | FAQ | Job Oportunities |
| Contact Us | Customer Feedback | Sitemap | | Intranet |

©2006 Created and Maintained by WSI.
This site is optimized for Netscape 5 and Internet Explorer 5.5 or higher. Please download an updated version now.